Genuine Acer eMachines E642G USB Board with Cable – Replacement Parts

8,90 

Restore the functionality of your Acer eMachines E642G laptop’s USB ports with this genuine USB board and cable assembly. Easy to install and crafted with quality materials, this replacement part ensures reliable connectivity for your peripherals. Upgrade or replace your existing USB board effortlessly and get back to using your devices with ease!

1 in stock

Free worldwide shipping on all orders over 150 €

  • 30 days easy returns
Guaranteed Safe Checkout

Upgrade your Acer eMachines E642G laptop with this genuine USB board and cable assembly, designed to restore functionality to your device’s USB ports. Crafted with precision and quality materials, this replacement part ensures reliable connectivity for your peripherals, such as keyboards, mice, and external drives. Installation is straightforward, requiring minimal technical expertise. Simply remove the old USB board and cable and replace it with this new assembly to regain full use of your laptop’s USB ports. Whether you’re replacing a faulty board or upgrading for improved performance, this genuine Acer part is the perfect solution for your laptop repair needs.

  • Europe
    • LCD Screens & Laptop Housings: $10.78 (13,90 EUR)
    • Other Categories: $6.42 (8,90 EUR)
  • Worldwide
    • LCD Screens & Laptop Housings: $15.11 (9,90 EUR)
    • Other Categories: $9.67 (5,90 EUR)

Shipping & Delivery time

We ship in max 2 days.

  • Europe: Average 6 days
  • Worldwide: Varies by country, but always competitive. For instance,
    • Argentina: 5-7 days
    • Australia: 6-8 days
    • Brazil: 8-12 days
    • Canada: 7-10 days
    • Egypt: 7-10 days
    • India: 10-15 days
    • Japan: 6-8 days
    • South Africa: 10-12 days
    • Thailand: 5-7 days
    • United Arab Emirates: 8-10 days
    • United States: 8-12 days

Based on our research conducted in 2023, we’re proud to share our average delivery times to various European countries, for example:

  • Belgium: 5 days
  • Italy: 4 days
  • Poland: 8 days
  • Montenegro: 9 days
  • Germany: 2-3 days
  • Hungary: 4-5 days
  • Malta: 6 days
  • Sweden: 6 days
  • Czech Republic: 4-5 days
  • France: 5 days
  • Latvia: 6 days
  • Croatia: 5 days
  • United Kingdom: 8 days
  • Finland: 8 days
  • Denmark: 4 days
  • Switzerland: 6 days
  • Ireland: 6 days
  • Norway: 7 days
  • Lithuania: 6 days
  • Portugal: 4 days
  • Greece: 8 days
  • Cyprus: 12 days
  • Netherlands: 3-4 days

These figures represent the average time taken for our packages to reach our valuable customers in these countries. Please bear in mind that the actual delivery time may vary slightly.