HP Chromebook 14 G6 G7 Laptop LCD Hinges Shaft (L90413-001)
Ensure your HP Chromebook 14 G6 or G7’s screen stays firmly in place with this replacement LCD hinges shaft. Perfect for repairing loose or broken hinges, this part will restore the functionality and stability of your laptop’s display.
**Product Features:**
– **Compatibility:** Designed specifically for the HP Chromebook 14 G6 and G7 models.
– **Part Number:** L90413-001.
– **Functionality:** Replaces loose, damaged, or broken hinges, ensuring smooth opening and closing of the laptop screen.
– **Durability:** High-quality replacement part for long-lasting performance.
**Why Choose This LCD Hinges Shaft?**
– **Reliable Replacement:** Restores hinge stability and ensures smooth movement of the screen.
– **Easy Installation:** Direct replacement for the existing hinges without any modifications.
– **Worldwide Shipping:** Available for global delivery, with a focus on Europe.
**Note:** We do not provide installation instructions, but if you require any assistance, feel free to contact us. We’re here to help. The photos in this listing show the actual hinges shaft you will receive, ensuring you get exactly what you need.
- Europe
- LCD Screens & Laptop Housings: $10.78 (13,90 EUR)
- Other Categories: $6.42 (8,90 EUR)
- Worldwide
- LCD Screens & Laptop Housings: $15.11 (9,90 EUR)
- Other Categories: $9.67 (5,90 EUR)
Shipping & Delivery time
We ship in max 2 days.
- Europe: Average 6 days
- Worldwide: Varies by country, but always competitive. For instance,
- Argentina: 5-7 days
- Australia: 6-8 days
- Brazil: 8-12 days
- Canada: 7-10 days
- Egypt: 7-10 days
- India: 10-15 days
- Japan: 6-8 days
- South Africa: 10-12 days
- Thailand: 5-7 days
- United Arab Emirates: 8-10 days
- United States: 8-12 days
Based on our research conducted in 2023, we’re proud to share our average delivery times to various European countries, for example:
- Belgium: 5 days
- Italy: 4 days
- Poland: 8 days
- Montenegro: 9 days
- Germany: 2-3 days
- Hungary: 4-5 days
- Malta: 6 days
- Sweden: 6 days
- Czech Republic: 4-5 days
- France: 5 days
- Latvia: 6 days
- Croatia: 5 days
- United Kingdom: 8 days
- Finland: 8 days
- Denmark: 4 days
- Switzerland: 6 days
- Ireland: 6 days
- Norway: 7 days
- Lithuania: 6 days
- Portugal: 4 days
- Greece: 8 days
- Cyprus: 12 days
- Netherlands: 3-4 days
These figures represent the average time taken for our packages to reach our valuable customers in these countries. Please bear in mind that the actual delivery time may vary slightly.