MSI GE60 2PC Apache DC Power Jack Cable – Genuine Replacement
If your MSI GE60 2PC Apache laptop is having trouble charging, a faulty DC power jack cable might be the cause. This high-quality replacement part restores your laptop’s ability to charge efficiently and maintain a stable connection.
🔹 Key Features:
✔ Genuine Replacement – Specifically designed for MSI GE60 2PC Apache laptops
✔ Durable & High-Quality – Ensures a stable power connection for smooth charging
✔ Pre-Soldered Connector – Ready to install for a hassle-free replacement
✔ Perfect Fit – Matches the original DC jack cable for easy installation
✔ OEM Specifications – Same quality as the original part for reliable performance
💡 Compatibility:
- Designed for MSI GE60 2PC Apache (Check your laptop model before purchasing)
- Standard DC charging port cable – Matches OEM design
📸 Real Photos: The product images are actual photos of the item you will receive – no surprises!
❓ Need Help? We don’t provide installation instructions, but you can message us if you need assistance before or after your purchase.
📦 Fast Worldwide Shipping! Get your MSI laptop back in action with this genuine DC power jack cable.
- Europe
- LCD Screens & Laptop Housings: $10.78 (13,90 EUR)
- Other Categories: $6.42 (8,90 EUR)
- Worldwide
- LCD Screens & Laptop Housings: $15.11 (9,90 EUR)
- Other Categories: $9.67 (5,90 EUR)
Shipping & Delivery time
We ship in max 2 days.
- Europe: Average 6 days
- Worldwide: Varies by country, but always competitive. For instance,
- Argentina: 5-7 days
- Australia: 6-8 days
- Brazil: 8-12 days
- Canada: 7-10 days
- Egypt: 7-10 days
- India: 10-15 days
- Japan: 6-8 days
- South Africa: 10-12 days
- Thailand: 5-7 days
- United Arab Emirates: 8-10 days
- United States: 8-12 days
Based on our research conducted in 2023, we’re proud to share our average delivery times to various European countries, for example:
- Belgium: 5 days
- Italy: 4 days
- Poland: 8 days
- Montenegro: 9 days
- Germany: 2-3 days
- Hungary: 4-5 days
- Malta: 6 days
- Sweden: 6 days
- Czech Republic: 4-5 days
- France: 5 days
- Latvia: 6 days
- Croatia: 5 days
- United Kingdom: 8 days
- Finland: 8 days
- Denmark: 4 days
- Switzerland: 6 days
- Ireland: 6 days
- Norway: 7 days
- Lithuania: 6 days
- Portugal: 4 days
- Greece: 8 days
- Cyprus: 12 days
- Netherlands: 3-4 days
These figures represent the average time taken for our packages to reach our valuable customers in these countries. Please bear in mind that the actual delivery time may vary slightly.